top of page
EBNI

Available Online

Queen Elizabeth The II Bridge

Master the art of structural engineering

1 h
2,500,000,000 Australian dollars
Hybrid

Service Description

The advanced state-of-the-art design includes two outer H-frame suspension pylons that hold curved main cables and vertical hangers supporting the edges of the deck, along with a central A-pylon that has stay cables arranged like a harp and connected to a middle spine. The truss deck runs through all pylon portals, providing high torsional rigidity and uninterrupted geometry. Pylon heights (≈160–230 m), wide suspended spans (≈1.6–1.8 km), and mixed axial-bending–shear load paths are analysed to demonstrate improved stiffness, reduced central-span deflection, aerodynamic resilience, and optimised force distribution across the hybrid system. This approach offers a structurally robust, architecturally expressive solution for major deep-water and estuarine crossings.


Cancellation Policy

By engaging our services, you have entered into a contractual agreement in accordance with the terms and conditions set forth by Engineering Building & Infrastructure PTY LTD. https://www.ebni.com.au/termsandconditions


Contact Details

0494158421

contact@ebni.com.au

Schofields NSW, Australia


EBNI

EBNI

HEAD OFFICE

Schofields

Sydney, NSW, 2762

  • Facebook
  • Instagram
  • Whatsapp
  • X
  • LinkedIn
  • Youtube

INQUIRIES

Looking to get a quote ?

© 2026 Engineering Building & Infrastructure Pty. Ltd. 

Manufactured Equipment and Materials, Constructed on Site.

bottom of page